D303M
2009-02-09 20:36:01 UTC
We are in the process of deploying an exchange 2007 CCR. We currently have a
single exchange 2007 server. My plan is to install the cluster in the same
mail org and then move the mailboxes from the existing server to the cluster.
I'[m guessing that the machines have to be in the same mail org?
Is there anything else I need to consider - is it going to be a problem
removing the old mail server once the mailboxes are moved?
Thanks!
single exchange 2007 server. My plan is to install the cluster in the same
mail org and then move the mailboxes from the existing server to the cluster.
I'[m guessing that the machines have to be in the same mail org?
Is there anything else I need to consider - is it going to be a problem
removing the old mail server once the mailboxes are moved?
Thanks!